NEWS ABOUT CONACT SANYI WORLDWIDE
HomeProductsIntegrated Shelter

Products

SYPF-U**C

PU non-floor faucet serging shelter

SYPF-U**C Series

Structure: PU non-floor split mounting type/faucet serging

1.1  Wall: PU 100/75mm thermally insulated board

          PU density: 40KG/ m3

Wall connected with faucet serging, the joint corner is hot dipped galvanized steel or aluminum, the in- and exterior wall are hot dipped galvanized steel, the steel sheet is 0.5mm thick or by customer’s order.

1.2  Floor: without floor, cement and porcelain tile floor can be used.

1.3 Roof: PU 75mm thermally insulated panel with corrugated monocline roof. Roof connected with corrugate, no glue or waterproof material acquired. The in- and exterior roof are hot dipped galvanized steel, the steel sheet is 0.5mm thick or by customer’s order.

1.4 Door: thermal insulation panel with heavy-duty deadlock